Muhammad Mustafa Khan,
An Energy & Environment Engineer having professional experience major in Occupational Health and Safety in Construction, with sound knowledge of Construction Management, Projects, Legal HSE compliance and Integrated Management System. Other areas of knowledge and interests are Environmental and Social Impact Assessment-ESIA, Emergency Response Plan-ERP and Environment management plan-EMP.
Supports the Top Management in the HSE Policy and Guidelines issue.
Supports the Top Management in the Organization roles and responsibilities definition, for what concerns safety aspects.
Supports the Top Management in the HSE Management System standard issue.
Ensures, in accordance with the Corporate guidelines, the implementation, updating, review and auditing of the Company HSE Systems.
Monitors the effective implementation of appropriate Safety and Environment System procedures and provide for their updating in line with changes in Legislation and Company Directives.
Provides for motivation and familiarization of all Company personnel respecting the importance of complying with Company system procedures and all Safety equipment provided.
Assists the Commercial, Engineering and Operations Department in their dealings with Clients in all issues concerned with Health and Safety at work.
Conducts safety audits both internal and external.
Takes part in accident / incident investigation.
Carries out analysis of accident / incident statistics, identifying trends and suggesting improvement plans.
Provides technical support to Senior Management on any safety related subjects.
Carries out any in-house safety training.
Carries out safety audits on Sub-contractors.
Liaises between Clients on safety related issues.
Safeties related engineering input into new projects and modification programs.
Participates to HAZOP meetings prior to procurement and installation activities.
Performs R
To perform HSE Inspection of work positioning equipment (29CFR1926 subpart V App F) on daily basis for all the activities executed at the project site all areas.
Implementation of 29CFR1926.351 (Acr Welding and cutting) and 29CFR1926.352 (Fire Prevention).
To conduct Tool Box Talks on daily basis with HSE team.
Maintain official records of HSE department.
Executing safety programs and minimize company safety losses by implementation of 29CFR1926.502 (fall protection system criteria and practices) and 29CFR1926.503 (Training requirement).
Implementation of 29CFR1926.1412 and 29CFR1926.1413 which is inspection of cranes and wire rope inspection.
Investigating incidents, determine root cause and develop corrective actions.
Supporting HSE inspections, audits and self-assessments.
Implementation of 29CFR1926.21 by developed training plan and conduct training on different topics related to HSE with Labors and Machine Operator.
Conducting Job Analysis before Performing Any Activity.
Proper Implementation of 29CFR1926 subpart F (Fire protection and prevention)
Executing inspection of firefighting equipment’s.
Proper Implementation of 29CFR1926 subpart G (Sign, signals and barricades).
Implementation of 29CFR1926.25 (Housekeeping) and assurance of 29CFR1926.28 (PPEs).
Mobilization and perusal of budgetary supports from management for Safety, Health and Environment improvements.
Ensuring satisfaction of client regarding Health, Safety and Environment by controlling on compliances.
To conduct Tool Box Talks on daily basis with HSE team and Labor.
Supporting HSE inspections, audits and self-assessments.
Mobilization and perusal of budgetary supports from management for Safety, Health and Environment improvements.
Conducting Job Analysis before Performing Any Activity.
Maintain official records of HSE department.
To conduct inspection of cranes and wire rope inspection.
Executing inspection of firefighting equipment’s.
I worked in distillery section, where molasses is converted into carbon dioxide which is further purified at the CO2 plant. Where first purify then liquefy and finally solidify and sent towards the storage tank, 2nd thing is Alcohol which is extracted at distillation column and get different quality of Alcohol. the 3rd one is Sprite which is obtained by Alcohol.
There was also biomass plant where used molasses which is free from sugar, that is converted into biomass in the absence of oxygen. Which is sent towards the furnace and boiler section. In boiler steam is produced, after production, it strikes on the turbine that creates mechanical power which is converted into electrical power by the help of Generator.